One studio,
from brief to handover.
Full interior design and fit-out for residential, hospitality, commercial and exhibition spaces. We draw it, specify it, build it in Kyambogo, and hand it back to you finished — in eight to fourteen weeks, with a snag walk and a signed warranty.
What kind of brief
are you holding?
Tell us the type of space and we'll show you a comparable handover from the past two years, plus the typical timeline and budget band you'd plan against.
- 01 Apartment refresh 1–2 rooms · 4–6 wks
- 02 Full home 3–5 rooms · 8–12 wks
- 03 Boutique hotel 12–30 keys · 12–16 wks
- 04 Café · restaurant FOH + BOH · 8–12 wks
- 05 Office · showroom 200–800 m² · 10–14 wks
- 06 Pop-up · exhibition 3–5 day build · 1–3 mo plan
Four moves,
every project.
A repeatable process for spaces that aren't. One project lead from brief to handover, no hand-offs, no sub-sub-contractors.
-
01
Listen.
Brief, budget, brand, behaviour. We walk the site at three times of day before we draw a thing.
1–2 weeks -
02
Specify.
Mood becomes material. Every finish to a swatch, every dimension to a piece — line-item BOQ, no surprises.
2–4 weeks -
03
Make.
Four benches and a finish room in Kyambogo. Two-stage QA: once on the bench, once at the gate.
4–10 weeks -
04
Install.
Sequenced site work, snag-free handover, 30-day site walk. A 12-month warranty on every finish.
1–3 weeks
The work, by sector.
Five recent handovers across the four sectors we work in. Hover for the brief, click through for the full case study, BOQ summary and time-lapse.
Three tiers, no surprises.
Every quote we send is built from one of these three. Every line item is broken out on the BOQ — we don't hide trade margins, and we publish our daily rate.
- — Tier 01 · Refresh
Refresh.
From UGX 18m· 4–6 wks- Finishes refresh on existing space
- Up to 4 wall finishes specified
- Soft-furnishing & décor pack
- One day of bench-made furniture
- 30-day snag walk
- ★ Most chosen— Tier 02 · Full fit-out
Full fit-out.
From UGX 95m· 8–14 wks- Concept · 3D · finish board · BOQ
- Custom millwork & joinery
- Bench-made furniture pack
- MEP coordination + site supervision
- Phased install + 30-day snag walk
- 12-month warranty on finishes
- — Tier 03 · Design only
Design only.
From UGX 6m· 3–4 wks- Concept + 3D + finish board
- Tender-ready BOQ & drawings
- Two rounds of revisions
- Hand-off to your contractor
- Optional site supervision day-rate
Tell us what you have in mind.
Send a brief and we'll come back with a written response within five working days — a sketch, a BOQ range and a realistic timeline. Every enquiry is read and replied to by a project lead, not a bot.
Eleven years of FAQs,
distilled.
The things every client asks in the first call. If yours isn't here, drop it in the brief — we'll address it on the reply.
-
Refresh: 4–6 weeks. Full fit-out: 8–14 weeks. Exhibition: 3–4 weeks. We commit to a date in writing on the BOQ — and pay a daily late-fee penalty if we miss it.
-
Almost always. Tell us the number on the brief. We'll come back with a curated quote that fits — usually within 5% — and flag the line items that would change if you stretched it.
-
Yes — Tier 03. We produce drawings, a finish board and a tender-ready BOQ that any decent contractor can build. Most clients hand it back to us to execute, but you don't have to.
-
30% on BOQ sign-off, 40% at frame stage, 25% at gate-out, 5% on snag-walk sign-off. UGX bank transfer or MoMo, USD wire for international.
-
Yes — Tier 01 starts at UGX 18m. Anything under that, we'll point you at the shop catalogue and a hand-picked décor package instead. We'd rather be honest than over-sell.
-
Variation orders are priced in writing before work starts on them — no surprises on the final invoice. About 88% of our projects in 2025 came in within ±5% of the signed BOQ.
Bring your project
to life with Dawin.
Share your brief and we'll come back with a curated quote and timeline within five working days. Every enquiry is assigned a project lead from day one.
